Sciweavers

210 search results - page 37 / 42
» Restart Scheduling for Genetic Algorithms
Sort
View
85
Voted
TASE
2010
IEEE
14 years 4 months ago
Optimization of Group Elevator Scheduling With Advance Information
Group elevator scheduling has received considerable attention due to its importance to transportation efficiency for mid-rise and high-rise buildings. One important trend to improv...
Jin Sun, Qianchuan Zhao, Peter B. Luh
COR
2007
80views more  COR 2007»
14 years 9 months ago
Scheduling with tool changes to minimize total completion time under controllable machining conditions
Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention...
M. Selim Akturk, Jay B. Ghosh, Rabia K. Kayan
DATE
1999
IEEE
162views Hardware» more  DATE 1999»
15 years 1 months ago
MOCSYN: Multiobjective Core-Based Single-Chip System Synthesis
In this paper, we present a system synthesis algorithm, called MOCSYN, which partitions and schedules embedded system specifications to intellectual property cores in an integrate...
Robert P. Dick, Niraj K. Jha
AIR
1999
90views more  AIR 1999»
14 years 9 months ago
A Survey of Automated Timetabling
The timetabling problem consists in scheduling a sequence of lectures between teachers and students in a prefixed period of time (typically a week), satisfying a set of constraints...
Andrea Schaerf
GECCO
2007
Springer
210views Optimization» more  GECCO 2007»
15 years 3 months ago
Mining breast cancer data with XCS
In this paper, we describe the use of a modern learning classifier system to a data mining task. In particular, in collaboration with a medical specialist, we apply XCS to a prima...
Faten Kharbat, Larry Bull, Mohammed Odeh