Sciweavers

3563 search results - page 179 / 713
» Scheduling Algorithms for Procrastinators
Sort
View
ICC
2007
IEEE
168views Communications» more  ICC 2007»
15 years 10 months ago
Opportunistic Link Scheduling with QoS Requirements in Wireless Ad Hoc Networks
— In this paper, we study the link layer scheduling problem in wireless ad hoc networks. In such a network, the communication links compete for the scarce and time-varying wirele...
Qing Chen, Qian Zhang, Zhisheng Niu
IPPS
2006
IEEE
15 years 10 months ago
A hierarchical scheduling model for component-based real-time systems
In this paper, we propose a methodology for developing component-based real-time systems based on the concept of hierarchical scheduling. Recently, much work has been devoted to t...
José L. Lorente, Giuseppe Lipari, Enrico Bi...
LCN
2003
IEEE
15 years 9 months ago
Scheduling Resources in Programmable and Active Networks Based on Adaptive Estimations
In active and programmable networks, packet processing could be accomplished in the router within the data path. For efficient resource allocation in such networks, the packet sch...
Fariza Sabrina, Sanjay Jha
HIPC
2003
Springer
15 years 9 months ago
Double-Loop Feedback-Based Scheduling Approach for Distributed Real-Time Systems
The use of feedback control techniques has been gaining importance in real-time scheduling as a means to provide predictable performance in the face of uncertain workload. In this ...
Suzhen Lin, G. Manimaran
ECRTS
1999
IEEE
15 years 8 months ago
Handling sporadic tasks in off-line scheduled distributed real-time systems
Many industrial applications mandate the use of a timetriggered paradigm and consequently the use of off-line scheduling for reasons such as predictability, certification, cost, o...
Damir Isovic, Gerhard Fohler