Sciweavers

3563 search results - page 570 / 713
» Scheduling Algorithms for Procrastinators
Sort
View
265
Voted
ICDE
2008
IEEE
140views Database» more  ICDE 2008»
16 years 6 months ago
Top-k Spatial Joins of Probabilistic Objects
Probabilistic data have recently become popular in applications such as scientific and geospatial databases. For images and other spatial datasets, probabilistic values can capture...
Vebjorn Ljosa, Ambuj K. Singh
GIS
2007
ACM
16 years 5 months ago
Evacuation route planning: scalable heuristics
Given a transportation network, a vulnerable population, and a set of destinations, evacuation route planning identifies routes to minimize the time to evacuate the vulnerable pop...
Sangho Kim, Betsy George, Shashi Shekhar
ICALP
2009
Springer
16 years 5 months ago
Sleep with Guilt and Work Faster to Minimize Flow Plus Energy
In this paper we extend the study of flow-energy scheduling to a model that allows both sleep management and speed scaling. Our main result is a sleep management algorithm called I...
Tak Wah Lam, Lap-Kei Lee, Hing-Fung Ting, Isaac Ka...
ESA
2009
Springer
124views Algorithms» more  ESA 2009»
15 years 11 months ago
Minimum Makespan Multi-vehicle Dial-a-Ride
Dial-a-Ride problems consist of a set V of n vertices in a metric space (denoting travel time between vertices) and a set of m objects represented as source-destination pairs {(si,...
Inge Li Gørtz, Viswanath Nagarajan, R. Ravi
SASO
2008
IEEE
15 years 11 months ago
Towards Desynchronization of Multi-hop Topologies
In this paper we study desynchronization, a closelyrelated primitive to graph coloring. A valid graph coloring is an assignment of colors to nodes such that no node’s color is t...
Julius Degesys, Radhika Nagpal