Sciweavers

157 search results - page 5 / 32
» Sizing a pilot production line using simulation
Sort
View
WSC
1998
15 years 1 months ago
Simulating Haul Durations for Linear Scheduling
A major portion of highway construction work is comprised of linear activities. A linear activity is one that progresses along a path (non-stationary), as it does it is complete a...
David J. Harmelink, Maria Andrea Bernal
128
Voted
TASE
2011
IEEE
14 years 7 months ago
Multiclass Flow Line Models of Semiconductor Manufacturing Equipment for Fab-Level Simulation
—For multiclass flow line models, we identify a class of service times that allow a decomposition of the system into subsets of servers called channels. In each channel, the cus...
James R. Morrison
102
Voted
ICSE
2003
IEEE-ACM
15 years 5 months ago
A Tutorial on Feature Oriented Programming and Product-Lines
ct Feature Oriented Programming (FOP) is a design methodology and tools for program synthesis. The goal is to specify a target program in terms of the features that it offers, and ...
Don S. Batory
WSC
2000
15 years 1 months ago
Using simulation to support implementation of flexible manufacturing Cell
A simulation model was developed and tested using Taylor II to justify the implementation of a Flexible Manufacturing Cell (FMC). The current production capacity at the existing C...
Kambiz Farahmand
SIGMETRICS
2003
ACM
147views Hardware» more  SIGMETRICS 2003»
15 years 5 months ago
Effect of node size on the performance of cache-conscious B+-trees
In main-memory databases, the number of processor cache misses has a critical impact on the performance of the system. Cacheconscious indices are designed to improve performance b...
Richard A. Hankins, Jignesh M. Patel