Sciweavers

15727 search results - page 2805 / 3146
» Software Engineering - Introduction
Sort
View
TASE
2008
IEEE
15 years 4 months ago
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem
This paper addresses the general single-machine earliness-tardiness problem with distinct release dates, due dates, and unit costs. The aim of this research is to obtain an exact n...
Hoksung Yau, Yunpeng Pan, Leyuan Shi
136
Voted
TASE
2008
IEEE
15 years 4 months ago
Group Elevator Scheduling With Advance Information for Normal and Emergency Modes
Group elevator scheduling has long been recognized as an important problem for building transportation efficiency, since unsatisfactory elevator service is one of the major complai...
Peter B. Luh, Bo Xiong, Shi-Chung Chang
127
Voted
TASE
2008
IEEE
15 years 4 months ago
On Clamping Planning in Workpiece-Fixture Systems
Deformation at contacts between the workpiece and locators/clamps resulting from large contact forces causes overall workpiece displacement, and affects the localization accuracy o...
Caihua Xiong, Michael Yu Wang, You-Lun Xiong
136
Voted
TASE
2008
IEEE
15 years 4 months ago
Lean Buffering in Serial Production Lines With Nonidentical Exponential Machines
Lean buffering is the smallest buffer capacity, which is necessary and sufficient to ensure the desired production rate of a manufacturing system. Literature offers methods for des...
Shu-Yin Chiang, Alexander Hu, Semyon M. Meerkov
TASE
2008
IEEE
15 years 4 months ago
Vision-Based Online Process Control in Manufacturing Applications
Applications such as layered manufacturing, or in general, solid free-form fabrication, pose a major challenge on online process control. For these parts to be functional, it is i...
Yuan Cheng, Mohsen A. Jafari
« Prev « First page 2805 / 3146 Last » Next »