The large latency of memory accesses is a major obstacle in obtaining high processor utilization in large scale shared-memory multiprocessors. Access to remote memory is likely to ...
Edward D. Moreno, Sergio Takeo Kofuji, Marcelo H. ...
Scheduling of processes in mixed batch/continuous plants, due to their hybrid nature can become very complex. This paper presents the Timed Hybrid Petri net (THPN) as a suitable t...
Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
Model-Driven Engineering (MDE) has been advocated as an effective way to deal with today's software complexity. MDE can be seen as an integrative approach combining existing ...
Protos is a popular tool for business process modelling used in more than 1500 organizations. It has a built-in Petri-net-based simulation engine which shows key performance indica...
Florian Gottschalk, Wil M. P. van der Aalst, Moniq...