Sciweavers

2994 search results - page 453 / 599
» Time sequences
Sort
View
SDM
2011
SIAM
232views Data Mining» more  SDM 2011»
14 years 4 months ago
A Sequential Dual Method for Structural SVMs
In many real world prediction problems the output is a structured object like a sequence or a tree or a graph. Such problems range from natural language processing to computationa...
Shirish Krishnaj Shevade, Balamurugan P., S. Sunda...
TON
2012
13 years 3 months ago
Some Fundamental Results on Base Station Movement Problem for Wireless Sensor Networks
—The benefits of using mobile base station to prolong sensor network lifetime have been well recognized. However, due to the complexity of the problem (time-dependent network to...
Yi Shi, Y. Thomas Hou
CPAIOR
2005
Springer
15 years 6 months ago
Mixed Discrete and Continuous Algorithms for Scheduling Airborne Astronomy Observations
We describe the problem of scheduling astronomy observations for the Stratospheric Observatory for Infrared Astronomy, an airborne telescope. The problem requires maximizing the nu...
Jeremy Frank, Elif Kürklü
RAS
2006
126views more  RAS 2006»
15 years 1 months ago
Multi-robot cooperation-based mobile printer system
This paper proposes a mobile printer system (MPS) based on multi-robot cooperation. The system consists of multiple mobile robots, a wireless LAN system, a graphic user interface ...
Kang-Hee Lee, Jong-Hwan Kim
VLDB
2005
ACM
397views Database» more  VLDB 2005»
16 years 1 months ago
Concurrency control and recovery for balanced B-link trees
Abstract. In this paper we present new concurrent and recoverable B-link-tree algorithms. Unlike previous algorithms, ours maintain the balance of the B-link tree at all times, so ...
Ibrahim Jaluta, Seppo Sippu, Eljas Soisalon-Soinin...