Sciweavers

2169 search results - page 22 / 434
» Using Risk Analysis to Evaluate Design Alternatives
Sort
View
JITECH
2007
220views more  JITECH 2007»
14 years 11 months ago
Fixing the payment system at Alvalade XXI: a case on IT project risk management
This case describes the implementation and subsequent failure of an innovative system installed in the bars of Alvalade XXI, the recently built football stadium in Lisbon, Portuga...
Ramon O'Callaghan
INFOCOM
2000
IEEE
15 years 4 months ago
Alternate Path Routing for Multicast
Abstract— Alternate path routing has been well-explored in telecommunication networks as a means of decreasing the call blocking rate and increasing network utility. However, asi...
Daniel Zappala
CORR
2008
Springer
88views Education» more  CORR 2008»
14 years 11 months ago
Framework for Dynamic Evaluation of Muscle Fatigue in Manual Handling Work
- Muscle fatigue is defined as the point at which the muscle is no longer able to sustain the required force or work output level. The overexertion of muscle force and muscle fatig...
Liang Ma, Fouad Bennis, Damien Chablat, Wei Zhang
MINENET
2006
ACM
15 years 5 months ago
SC2D: an alternative to trace anonymization
Progress in networking research depends crucially on applying novel analysis tools to real-world traces of network activity. This often conflicts with privacy and security requir...
Jeffrey C. Mogul, Martin F. Arlitt
ICCD
2008
IEEE
158views Hardware» more  ICCD 2008»
15 years 8 months ago
Design and evaluation of an optical CPU-DRAM interconnect
— We present OCDIMM (Optically Connected DIMM), a CPU-DRAM interface that uses multiwavelength optical interconnects. We show that OCDIMM is more scalable and offers higher bandw...
Amit Hadke, Tony Benavides, Rajeevan Amirtharajah,...