Sciweavers

2343 search results - page 394 / 469
» Visual-Concept Search Solved
Sort
View
115
Voted
SCHEDULING
2008
112views more  SCHEDULING 2008»
15 years 4 months ago
Time-constrained project scheduling
We propose a new approach for scheduling with strict deadlines and apply this approach to the TimeConstrained Project Scheduling Problem (TCPSP). To be able to meet these deadlines...
T. A. Guldemond, Johann Hurink, Jacob Jan Paulus, ...
HEURISTICS
2008
136views more  HEURISTICS 2008»
15 years 3 months ago
Enhancing set constraint solvers with lexicographic bounds
Since their beginning in constraint programming, set solvers have been applied to a wide range of combinatorial search problems, such as bin-packing, set partitioning, circuit desi...
Andrew Sadler, Carmen Gervet
ICRA
2010
IEEE
154views Robotics» more  ICRA 2010»
15 years 3 months ago
Integrated Grasp and motion planning
— In this work, we present an integrated planner for collision-free single and dual arm grasping motions. The proposed Grasp-RRT planner combines the three main tasks needed for ...
Niko Vahrenkamp, Martin Do, Tamim Asfour, Rüd...
ICRA
2010
IEEE
142views Robotics» more  ICRA 2010»
15 years 3 months ago
Learning and planning high-dimensional physical trajectories via structured Lagrangians
— We consider the problem of finding sufficiently simple models of high-dimensional physical systems that are consistent with observed trajectories, and using these models to s...
Paul Vernaza, Daniel D. Lee, Seung-Joon Yi
127
Voted
ICRA
2010
IEEE
154views Robotics» more  ICRA 2010»
15 years 3 months ago
Multi-agent path planning with multiple tasks and distance constraints
— The DPC algorithm developed in our previous work is an efficient way of computing optimal trajectories for multiple robots in a distributed fashion with timeparameterized cons...
Subhrajit Bhattacharya, Maxim Likhachev, Vijay Kum...