In a comprehensive study of methods for dealing with the problem of the initial transient, Hoad et al. (2008) determined that the MSER (White, 1997) was an efficient and effective...
: In this paper, we address a lot splitting and scheduling problem existent in a textile factory. The factory we study produces a set of products that are made of, or assembled fro...
Carina Pimentel, Filipe Pereira Alvelos, Antonio D...