This paper discusses a real-world application of simulation to schedule operator and machine resources in a floor tile manufacturing plant. The paper discusses attempts at using a...
Hank Czarnecki, Bernard J. Schroer, M. Mizzanur Ra...
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelate...
We will give a survey on results related to scheduling problems where machines are not continuously available for processing. We will deal with single and multi machine problems an...
We consider the problem of on-line scheduling with non-crossing constraints. The objective is to minimize the latest completion time. We provide optimal competitive ratio heuristi...
Packet scheduling in networks with quality of service constraints has been extensively studied as a single criterion scheduling problem. The assumption underlying single criterion ...