This paper presents a continuous-time mathematical formulation for freshwater and wastewater minimisation in multipurpose batch plants with and without a central reusable water st...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: concrete produced at several plants has to be delivered at customers' constru...
Verena Schmid, Karl F. Doerner, Richard F. Hartl, ...
Abstract— We study the problem of maximizing the aggregated revenue in sensor networks with deadline constraints. Our model is that of a sensor network that is arranged in the fo...
Register file (RF) is extremely vulnerable to soft errors, and traditional redundancy based schemes to protect the RF are prohibitive not only because RF is often in the timing c...
The Train Timetabling Problem (TTP) consists in finding a train schedule on a railway network that satisfies some operational constraints and maximizes a profit function which c...