Sciweavers

99 search results - page 18 / 20
» Scheduling with integer time budgeting for low-power optimiz...
Sort
View
CCE
2005
14 years 9 months ago
Wastewater minimisation using central reusable water storage in batch plants
This paper presents a continuous-time mathematical formulation for freshwater and wastewater minimisation in multipurpose batch plants with and without a central reusable water st...
Thokozani Majozi
COR
2010
177views more  COR 2010»
14 years 9 months ago
Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
Companies in the concrete industry are facing the following scheduling problem on a daily basis: concrete produced at several plants has to be delivered at customers' constru...
Verena Schmid, Karl F. Doerner, Richard F. Hartl, ...
94
Voted
CDC
2009
IEEE
189views Control Systems» more  CDC 2009»
15 years 2 months ago
Maximizing aggregated revenue in sensor networks under deadline constraints
Abstract— We study the problem of maximizing the aggregated revenue in sensor networks with deadline constraints. Our model is that of a sensor network that is arranged in the fo...
Srikanth Hariharan, Ness B. Shroff
LCTRTS
2009
Springer
15 years 4 months ago
A compiler optimization to reduce soft errors in register files
Register file (RF) is extremely vulnerable to soft errors, and traditional redundancy based schemes to protect the RF are prohibitive not only because RF is often in the timing c...
Jongeun Lee, Aviral Shrivastava
ATMOS
2007
114views Optimization» more  ATMOS 2007»
14 years 11 months ago
Fast Approaches to Robust Railway Timetabling
The Train Timetabling Problem (TTP) consists in finding a train schedule on a railway network that satisfies some operational constraints and maximizes a profit function which c...
Matteo Fischetti, Arrigo Zanette, Domenico Salvagn...