Abstract. We study the “subgraph connectivity” problem for undirected graphs with sublinear vertex update time. In this problem, we can make vertices active or inactive in a gr...
For all integers k 3, we give an O(n4 ) time algorithm for the problem whose instance is a graph G of girth at least k together with k vertices and whose question is "Does G...
This paper presents a set of techniques that makes constraint programming a technique of choice for solving small (up to 30 nodes) traveling salesman problems. These techniques in...
Recently, simulation-based methods have been successfully used for solving challenging stochastic optimization problems and equilibrium models. Here we report some of the recent p...
Abstract. Some constraint problems have a combinatorial structure where the constraints allow the sequence of variables to be rotated (necklaces), if not also the domain values to ...