Sciweavers

401 search results - page 37 / 81
» Static Dependent Costs for Estimating Execution Time
Sort
View
COMCOM
1998
106views more  COMCOM 1998»
14 years 11 months ago
Algorithms for delay-constrained low-cost multicast tree construction
With the proliferation of multimedia group applications, the construction of multicast trees satisfying Quality of Service QoS requirements is becoming a problem of prime import...
R. Sriram, Govindarasu Manimaran, C. Siva Ram Murt...
PPOPP
2003
ACM
15 years 5 months ago
Compiler support for speculative multithreading architecture with probabilistic points-to analysis
Speculative multithreading (SpMT) architecture can exploit thread-level parallelism that cannot be identified statically. Speedup can be obtained by speculatively executing threa...
Peng-Sheng Chen, Ming-Yu Hung, Yuan-Shin Hwang, Ro...
DATE
2008
IEEE
103views Hardware» more  DATE 2008»
15 years 6 months ago
Compositional design of isochronous systems
The synchronous modeling paradigm provides strong execution correctness guarantees to embedded system design while making minimal environmental assumptions. In most related framew...
Jean-Pierre Talpin, Julien Ouy, Loïc Besnard,...
JTRES
2010
ACM
15 years 2 days ago
Exhaustive testing of safety critical Java
With traditional testing, the test case has no control over non-deterministic scheduling decisions, and thus errors dependent on scheduling are only found by pure chance. Java Pat...
Tomás Kalibera, Pavel Parizek, Michal Maloh...
EMSOFT
2006
Springer
15 years 3 months ago
Modeling a system controller for timing analysis
Upper bounds on worst-case execution times, which are commonly called WCET, are a prerequisite for validating the temporal correctness of tasks in a real-time system. Due to the e...
Stephan Thesing